Upgrade of Lightning Arrestor and Earthing System

Electrical Systems

Location

Ajoki Flowstation, Edo State

Date

July 2023

Duration

14 days

Client

Enageed Resource Limited

Project Overview

Following reports of lightning strikes leading to some asset damage, the team investigated the integrity of the earthing grid and lightning arresters of the flow station, the control room, MCCs, generator house, tank farm and accommodation area, to establish their reliability against lightning strikes. The team designed, and installed an upgraded lightning arrester using the cutting edge indelec prevectron arresters fitted with surge counters, standard size of 25x2mm flat copper strip appropriately sized down conductors were properly terminated. Acceptable values from the earth resistance tests were obtained and the issue was successfully resolved.

Upgrade of Lightning Arrestor and Earthing System - Image 1
Upgrade of Lightning Arrestor and Earthing System - Image 2
Upgrade of Lightning Arrestor and Earthing System - Image 3
Upgrade of Lightning Arrestor and Earthing System - Image 4