Back to Projects
Completed

Flare System Assessment Services for OML 18

Inspection & Assessment

Location

Cawthorne Channel & Alakiri, Rivers State

Date

March 2024

Duration

3 days

Client

NEOL

Project Overview

The Management of NNPC Eighteen Operating Limited engaged our team to inspect and ascertain the state and integrity of the flares and flare ignition systems installed at the Alakiri, Cawthorne Channel 1, 2, and 3 flow stations. We visited all the sites in the creeks and carried out assessment and developed a scope documentations and associated Bill of Engineering Measurements and Evaluation (BEME) to revamp the flare system at each of the locations includes the flare header, pilot line, walkways, flare tips, flare ignition, flare line valves, the flare Bund walls etc. Designs and detailed specifications were developed and submitted to NEOL. This task was completed by UNITRITECH within 3days.

Flare System Assessment Services for OML 18 - Image 1
Flare System Assessment Services for OML 18 - Image 2
Flare System Assessment Services for OML 18 - Image 3
Flare System Assessment Services for OML 18 - Image 4